Dishwasher stops for last-mile crews: authorization gates, which connections require qualified personnel, and when to stop and escalate.
Estimated time: 50 min
Showing 3 of 7 steps. Sign in as a carrier to unlock the rest.
A dishwasher stop splits into delivery and placement, which most crews are assigned, and electrical and plumbing connections, which require documented qualification. Confirm what your work order authorizes, what your program has trained and documented you for, and what local rules allow at this address. Anything outside that boundary is inspect, photograph, and escalate.
The packed instructions are the procedure for every connection and every mounting decision. If they are missing, or they call for work your authorization does not cover, place the unit and escalate rather than working from memory of a different model.
Lay runners from the truck to the kitchen, measure the opening against the unit, and look at the existing hot supply, drain provision, and electrical provision. Record what is there with photos. Do not modify the rough-in to make the unit fit.