Washer hookup for delivery crews: the authorization and training gates that come first, then leveling, connections, and leak checks.
Estimated time: 40 min
Showing 3 of 7 steps. Sign in as a carrier to unlock the rest.
Do not connect anything until three things are true: the work order lists the hookup in scope, your program has documented training for this class of appliance and you are covered by it, and local rules permit a delivery crew to make the connection at this address. If any one is missing, deliver and place the unit, leave it disconnected, and notify dispatch.
The instructions packed with the unit are the procedure. Do not substitute habit or another model's sequence. If the instructions are missing, or they call for parts, tools, or steps outside your documented program, stop and escalate instead of improvising.
Confirm the hot and cold valves close fully, that the existing supply and drain are the types the instructions require, and that there is a grounded receptacle matching the nameplate. Corroded, seized, non-conforming, or missing connections are a stop-and-escalate condition, not something to adapt around.