Refrigerator water line work for delivery crews: required approvals, compatible manufacturer kits, and clear stop-and-escalate gates.
Estimated time: 30 min
Showing 3 of 7 steps. Sign in as a carrier to unlock the rest.
The water line is in scope only when the work order says so, your program has documented training for it that covers you, and local rules allow a delivery crew to connect to a potable supply at this address. If any one of those is missing, place the refrigerator, leave the line disconnected, and notify dispatch.
There must already be an accessible shutoff that closes completely and an existing supply of a type the refrigerator instructions accept. A saddle valve, a seized or weeping stop, corroded tubing, or no shutoff at all is a stop condition. Adding, tapping, or replacing plumbing is never delivery work.
Use only the manufacturer's kit for this model, complete and undamaged, with fittings that match both the appliance inlet and the existing supply. If the kit is missing, incomplete, or does not match, stop. Do not cut, modify, or assemble parts from stock to make something fit.